Gold Member Since 2012
Audited Supplier
Shanghai RuiBiao Construction Machinery Co., Ltd.

Reducer, Gearbox, Worm Gear manufacturer / supplier in China, offering Gearbox Gjj Baoda Construction Hoist Spare Parts Worm Gearbox, Limit Switch for Tower Crane Safe Load Indicator, Hoist Tower Crane Hoisting Limited Switch and so on.

(/ )

Supplier Homepage Product Passenger hoist and spare parts one Passenger hoist reducer Gearbox Gjj Baoda Construction Hoist Spare Parts Worm Gearbox

Gearbox Gjj Baoda Construction Hoist Spare Parts Worm Gearbox

FOB Price: US $345 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $345/ Piece
Get Latest Price
Port: Shanghai, China
Production Capacity: 10000
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: 11kw
  • Function: Distribution Power, Clutch, Change Drive Torque, Change Drive Direction, Speed Changing, Speed Reduction, Speed Increase
  • Hardness: Soft Tooth Surface
  • Step: Single-Step
  • Shaft Material: 40cr Forged Steel
  • Gear Housing: Cast Iron(Ht250 or Qt450)
  • Features: Reducer, Worm Gear Reducer
  • Certificate: ISO9001: 2000 Ce CCC
  • Helical Gear Hardness: HRC58-62
  • Transport Package: Wooden Case
  • Origin: Shanghai. China
  • Application: Motor, Electric Cars, Motorcycle, Machinery, Marine, Toy, Agricultural Machinery, Car
  • Layout: Three-Ring
  • Installation: Horizontal Type
  • Type: Cylindrical Gear Box
  • Helical Gear Material: 20crmntih and 17crnimo 6
  • Mounting Position: M1, M2, M3, M4, M5, M6
  • Gearing Arrangement: Bevel / Miter
  • Brand Name: Aoya
  • Trademark: AOYA
  • Specification: 11KW
  • HS Code: 84313900
Product Description
FAQ:

Q1:Whether you can provide customized products?
A1:Yes.We are hi-tech enterprise affiliated to China Academy of Building Research.We have a group of engineers, who have title of professor , senior engineer and engineer.We can give you special design as per the drawings of your building, helping you solve different problems faced in your projects.

Q2:Whether customized products takes a very long time to design and manufacture?
A2:Not exactly.Normally for us, some amendment in design to adapt your requirement will take one week.So even for your special project, it will be about 30-40 days delivery time.

Q3:What is the brand of your key components?
A3:Motor:Shanghai RUIBIAO  and ABB or Schneider can also be choosed.
Other electrical components:Schneider or Simens

Q4:What kind of services you can provide?
A4:We are dealing with construction machinery for about 10 year.High quality is our advantage, and high technology is our core competency.We ensure that  all  the machine have been completely tested in our factory before delivery.We will give you one year warranty for complete machine.For problems caused by our production defect, we will provide you free services by sending skilled engineer there.

Distance betwcen two shafts(mm)

80

100

125

144

160

200

Oil volumc(L)   

1.6

2.7

4.7

6.7

8.8

16

5. Storage condition
  Speed reducer could be stored indoor for 30 days, fill up speed reducer with recommended lubrication oil, and use bolt to replace acrator. Turn around couple set worm once very 30 days in order to protect oil scaling and bearing. When working, lubrication oil depth should be reduced to the corrct position, and acrator be re-installed. If the speed reducer had been stored indoor over one year or need to be removed to outdoor, machine supplier company should be contacted, and ask for extra user's manual.
  a) If there is no oil inside spced reducer, woum wheel oil of N320 must be filled to correct oil positi on level as regulation before running. Under special ease(if can't found oil of N320. N320 gear whecl oil be  permitted to use also), working load and transmission efficiency of speed reducer dccreasel.
  b) N320 worm wheel oil and N320 gear wheel oil can't be mixed together.
  c) Without permission, installed speed redueer can't be dismanted.
  For those who haven't read our usage menu about how to install, Iubrieate and maintain mahine leading to damage of machine, our company would cancel quality assurance.
 
 6. Category
 

Distance  between
Two shafts(mm)

125(144)

Speed
ratio

Nominal

8.25

10

12

14

16

20

25

Actual

8.25

10.33(10)

12

14

16

20

24.5

 
7. Loading capacity and efficiency
 

Reducing
speed ratio
(i)

Distance
bctwccn two
shafts(mm)

Input Speed
(r/min)

Input
efficicncy
(KW)

Target input
Torque
(NM)

General
Transmission
efficiency(%)

8.25

125

1500

17.6

895

91

144

1500

25.6

1185

89

10

125

1500

14.9

890

90

144

1500

19.7

1130

88.3

12

125

1500

12.4

1068

89

144

1500

17.1

1088

88

14

125

1500

11.72

895

89.4

144

1500

16.33

1180

87

16

125

1500

11.6

1000

88

144

1500

15.56

1296

86

20

125

1500

9

1010

87

144

1500

12.46

1296

85

25

125

1500

6.9

930

84

144

1500

9.44

1234

83.5

FAQ:

Q1:Whether you can provide customized products?
A1:Yes.We are hi-tech enterprise affiliated to China Academy of Building Research.We have a group of engineers, who have title of professor , senior engineer and engineer.We can give you special design as per the drawings of your building, helping you solve different problems faced in your projects.

Q2:Whether customized products takes a very long time to design and manufacture?
A2:Not exactly.Normally for us, some amendment in design to adapt your requirement will take one week.So even for your special project, it will be about 30-40 days delivery time.

Q3:What is the brand of your key components?
A3:Motor:Shanghai RUIBIAO  and ABB or Schneider can also be choosed.
Other electrical components:Schneider or Simens

Q4:What kind of services you can provide?
A4:We are dealing with construction machinery for about 10 year.High quality is our advantage, and high technology is our core competency.We ensure that  all  the machine have been completely tested in our factory before delivery.We will give you one year warranty for complete machine.For problems caused by our production defect, we will provide you free services by sending skilled engineer there.


Contact Carol Hu
 
Send your message to this supplier
Avatar
Mr. Johnny
*From:
To: Mr. Johnny
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now