Gold Member Since 2012
Audited Supplier
Shanghai RuiBiao Construction Machinery Co., Ltd.

Construction Lifting Hoist, Construction Hoist, Construction Elevator manufacturer / supplier in China, offering 2 Ton Double Cage Construction Lifting Hoist (SC200/200), Factory Sale Fixed Electric Hydraulic Scissor Lift Table, Construction Hoist Electrical Motor (11kw 15kw 18kw Motor Dynamo Electric Motor) and so on.

(/ )

Supplier Homepage Product Passenger hoist and spare parts two Passenger hoist 2 Ton Double Cage Construction Lifting Hoist (SC200/200)

2 Ton Double Cage Construction Lifting Hoist (SC200/200)

Purchase Qty.:
(Pieces)
1 2+
FOB Unit Price: US $20,000 US $19,000
Purchase Qty. (Pieces) FOB Unit Price
1 US $20,000
2+ US $19,000
Get Latest Price
Port: Shanghai, China
Production Capacity: 5000
Payment Terms: L/C, T/T, 30% TT in advance

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: SC100, SC200, SC100/100, SC200/200
  • Erection Height: 50m(33 Mast Sections)
  • Motor Power: 3*11kw
  • Construction Hoist Power Source: 380V/50Hz (Can Be Changed)
  • Rated Loading Capacity: 2*2000kg Double Cage
  • Size of Mast Section: 650*650*1508mm
  • Transport Package: Wooden Case
  • Origin: Shanghai, China
  • Usage: Muti Personnel and Materials Outdoor at Constructi
  • Cage / Enclosure (Type): Punched Alumium Plate / Galvanized Punched Steel
  • Safety Brake: Saj4.0-1.2 China Brand
  • Rated Lifting Speed: 36m/Min Direct Driven Without Inverter
  • Wall Tie Length: 2.8m-3.2m
  • Trademark: Construction Lifting Hoist
  • Specification: SC100, SC200, SC100/100, SC200/200
  • HS Code: 84313900
Product Description
2 Ton Double Cage Construction Lifting Hoist (SC200/200)
1.product description of  Construction Lifting Hoist :
 
Main parameterUnitType(SC200/200P)
Load capacityKg200*2
ElevationM150
Cage Size (L*W*H)M3.0*1.3*2.4
Lifting speedM/MIN0-42
Section dimensionsM650*650*1508
Safety device type SAJ4.0-1.2 (SRIBS Brand, Shanghai China)
Gear box 1:16
Motot powerkw11kw*3
kw15kw*3
Stop layer way automatic
Products name building construction materials lift 

A. Features of   Construction Lifting Hoist 
 
1. It is equipped with fully safety devices to guarantee the safe working;
2. Stable running and comfortable adaptability;
3. The transmission system adopts two-drive motors and three-drive motors. Planar double-eveloping worm gear reducer is adopted ensuring the high efficiency, max payload and long service life;
4. Simple electrical control system, easy operation and convenient maintenance withlow failure rate.
 
B. Advantages of our building construction materials lift  
 
1. Low operating cost but high efficiency;
2.Simplicity in operation;
3.High degree of safety;
4.Long durability;
5. Low energy consumption.
 
 
C. The SC series building construction materials lift  :
 
1. The SC series construction lifts has rack and pinion, by which the materials were lifted;
 
2. This product has no counter weight, dismantling easily and working safely;
 
3. Overload protection limiter and mechanical chain device are reliable and complete, optimal safety device select SAJ40-1.2, which restricts the excessive downward movement of the cage and prevents cage falling accidents;
 
4. The transmission system adopted three drive motors and three sets of reduction gears;
 
5. It has simple electrical control system, convenient to be maintained and low failure rate;
 
6. The mast sections of construction elevator are painted for four times. Also galvanized mast sections are available for customers;
 
7. Variable-frequency construction elevator are safe, stead and comfortable;
 
8. The start electricity is smaller than the working electricity;
 
9. Floor calling system is available for customers with extra payment;
 
10. Quick-wear parts are free to give to customers and one-year warranty for the main mechanism.
 
 
D. The Installation guide and charges of building construction materials lift  
 
The Seller will send one of her experienced engineer to the Buyer's site to help the completed installation works and training operators under the requirement of the Buyer. 
2). The Buyer is responsible for the following:
A. Make all Arrange for accommodation and traveling. 
B. Pay the round trip air ticket; Pay the engineer USD60 per working day as allowance. C.Chinese interpreter to ensure effective communication and raise working efficiency.
D. Arrange one Installation Team(4-6person)responsible for installation works. 
E. Ensure the safety of the engineer in buyer's Country
3). Preparation work on the site should be done well. Should the reason of buyer or the customer that caused the delay of installation, they have to bear the corresponded fees. The buyer has to fill in an installation contact form by the seller and fax to the seller to ensure the preparation work is well done Before the seller's engineer arriving the site of the buyer, Should the engineer of seller arrived the site of buyer but preparation work not done, the related fees should be paid by the buyer; building construction materials lift.
4). The installation period can be arranged by the seller and the buyer.
Send your message to this supplier
Avatar
Ms. Jocelyn
*From:
To: Ms. Jocelyn
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now